Understanding RF coverage requirements

  • After you conduct a spectrum analysis site survey, your next step is the all-important determination of proper 802.11 RF coverage inside your facility.
  • During the site survey interview, capacity and coverage requirements are discussed and determined before the actual site survey is performed.
  • In certain areas of your facility, smaller cells or co-location may be required because of a high density of users or heavy application bandwidth requirements
Advertisements